Skip to main content
model house on top of architects plans for a new development
Development Finance

Development Finance for First-Time Property Developers

Development finance for first-time developers is available in the market, but conditionally so. Although lenders will fund sensible and well-evidenced schemes, they won’t fund ambitions. Even with industry experience, a developer without a completed project on record will need to rely on the development deal itself to carry the weight of a development finance application. This usually means an experienced contractor, a credible professional team, a conservative appraisal, a meaningful equity contribution, and a robust exit strategy. Most first-time schemes that reach a lender without those elements in place do not reach terms. We work with developers at the start of their journey to build applications that do.

Speak to a specialist today about your first development project.

First-Time Developers: At a Glance

Development loans available from £150,000 to £5m+

Residential new-build, conversion, and heavy refurbishment projects considered

Deals assessed on scheme viability, not experience alone

Lender introductions across specialist, challenger, and private markets

Independent advice from initial appraisal through to drawdown

Is This the Right Finance for Your Project?

Development finance for first-time developers covers a wider range of borrowers than the terminology suggests. Lenders are less concerned with how a borrower is labelled and more with how the proposed scheme compares to what they are prepared to fund at this stage. Lenders do not exclusively define "no experience" as never having owned or improved property. A borrower who has completed light refurbishments but is now considering a ground-up build sits in this bracket. So does a buy-to-let investor with a portfolio but no direct development track record, or a self-builder funding a single residential unit.

The borrower profiles this page is most relevant to include those undertaking a first conversion or new-build project, investors transitioning from landlord to developer, experienced professionals in the construction or surveying sector moving into development, and individuals entering via a joint venture with a more experienced partner.

In terms of loan size, most specialist lenders begin to engage meaningfully from around £500,000 gross facility, though facilities from £150,000 upward exist for smaller conversions and single-unit builds. Project values of £2m to £10m gross development value (GDV) are common at this entry level.

Acceptable project types at this stage tend to be simpler in nature: single residential units, straightforward conversions of existing buildings, small terraced developments of two to four units, and light commercial-to-residential changes of use. Multi-phase sites, mixed-use schemes with significant commercial elements, and complex planning positions are better approached once at least an initial project is completed the borrower.

How Development Finance Works for First-Time Developers

Development finance is a short-term facility drawn in stages across a build programme, secured against the land or property and the developing asset. Unlike a purchase loan, the majority of the facility is typically drawn down in tranches as construction progresses, verified at each stage by a monitoring surveyor appointed by the lender.

For first-time developers, lenders approach the underwrite differently to a borrower with a completed scheme on their CV. The absence of personal track record shifts focus to everything else: the quality of the professional team, the robustness of the appraisal, the strength of the exit, and the level of equity the borrower is contributing. The deal structure tends to be more conservative on leverage and more rigorous on monitoring, but the loan mechanics are broadly the same.

In practice, most first-time schemes require at least one round of adjustment before a lender will issue terms. The gap is rarely fundamental, but it is often enough to prevent terms being issued without revision. It tends to be an overstated GDV, an incomplete cost plan, or a contractor appointment that has not yet been confirmed. Addressing those points before a formal submission is where time is most usefully spent.

Typical loan terms run from 12 to 24 months. Interest is usually retained or rolled up within the facility rather than serviced monthly, meaning borrowers are not making ongoing payments during the build programme. If interest is taken on a rolled-up basis, it is settled on exit, whereas if it’s retained then interest is deducted from the initial advance. Arrangement fees are either deducted from the initial advance or included in the facility and settled on exit, either from sales proceeds or a refinance. Day one land advance is typically agreed at the outset, with the construction element drawn progressively.

Lenders will appoint a quantity surveyor (QS) to review the schedule of works and cost plan before credit approval, and a monitoring surveyor to attend site and approve each drawdown request. For first-time borrowers, this level of oversight is generally a requirement rather than an option, and it is sensible to factor the associated costs into the initial appraisal.

The exit strategy matters from the first conversation. Whether the intention is to sell individual units on practical completion or refinance the completed development onto a term mortgage, lenders need a credible and evidenced route out. A clear exit, supported by realistic market comparables, has more influence over lender appetite than almost any other factor.

crane building new residential house using development finance

What Lenders Look for Without a Track Record

The practical question for any first-time developer is what replaces experience in the lender's underwriting. The answer is a combination of factors, none of which individually compensates for track record, but together can build a convincing case.

Contractor credibility carries significant weight. A lender uncomfortable with a borrower's personal experience will look closely at who is delivering the build. A main contractor with demonstrable experience in comparable schemes, appropriate insurances, and a JCT contract in place substantially changes the risk profile. Where a borrower intends to self-manage subcontractors directly rather than appoint a main contractor, lenders will be more cautious and leverage will likely reflect that.

The professional team around the development serves a similar function. An experienced architect who has delivered similar schemes, a QS-approved cost plan that is internally consistent, and a planning consent that is clean and implementable all reduce the uncertainty a lender is pricing. A weak or thin professional team on a first project is one of the more common reasons deals are declined or struggle to reach terms.

Scheme simplicity is a genuine advantage here. A straightforward conversion of a commercial building into three residential apartments, with full planning consent and a credible GDV supported by recent comparables, is a more fundable proposition than an ambitious nine-unit ground-up scheme with planning conditions still to discharge. Lenders calibrate risk to complexity, and at this stage, simplicity works in the borrower's favour.

The appraisal itself needs to be realistic. An overstated GDV is one of the most consistent reasons first-time development deals are declined. Where lender-appointed surveyors value the completed scheme materially below the borrower's figure, the leverage calculation falls, contingency assumptions unravel, and credit confidence erodes. Independent market evidence at the outset, rather than optimistic projections, tends to produce better outcomes.

How These Deals Are Structured: Leverage, Equity, and Drawdowns

Most lenders working with first-time property developers will apply conservative leverage parameters relative to what an experienced repeat developer might access. Typical loan to cost (LTC) ratios are 65% to 75%, and loan to GDV (LTGDV) is often constrained to around 55% to 60% as a baseline. In practice, this means the developer will needs to have a meaningful equity contribution, either from personal funds, a co-investor, or (where accepted by some lenders) equity in an existing property (or properties) used as additional security.

Higher equity requirements serve a dual purpose as it reduces the lender's exposure and demonstrates the borrower's financial commitment to the project. Where the developer has genuine ‘skin in the game’ a deal is usually viewed more favourably than one where the equity is marginal or reliant on day-one valuation uplift.

Drawdowns are released against certified progress at key build stages, commonly tied to foundation completion, first-floor structure, weathertight stage, and practical completion. Each release requires a monitoring surveyor sign-off, which introduces a natural checkpoint into the programme. First-time borrowers should treat this as useful discipline rather than a bureaucratic hurdle.

Contingency allowances are scrutinised closely. Most lenders will want to see a build cost contingency of at least 10% to 15% built into the appraisal. Borrowers who present cost plans without meaningful contingency, or who include it as a nominal figure, are signalling either inexperience or overconfidence, neither of which helps a first application. Lenders experienced in this market have seen enough cost overruns to know that contingency is not optional.

Personal guarantees are typically required. On a first scheme, a borrower should expect to give a full personal guarantee to the lender, which is standard practice and not a reflection of the individual deal quality.

Property developer reviewing refurbishment and conversion plans alongside architectural drawings and development appraisal documents

Common Reasons First-Time Development Applications Are Declined

Understanding where deals fail at this stage is commercially useful, particularly before committing time and cost to a formal application.

Over-optimistic GDV assumptions remain the most frequently cited issue. A borrower who has based their appraisal on the asking prices of comparable new-build units, rather than recent achieved sale prices in the same postcode, will often find the lender's valuation lands short. Achieved prices, net of agents' fees, are the relevant benchmark.

Weak contractor appointment is a close second. Borrowers presenting without a named contractor, or with one whose experience is limited to domestic extensions and light refurbishment, are asking lenders to accept construction risk that no amount of borrower enthusiasm offsets.

Inadequate exit planning is more common than it should be. "We'll sell the units when complete" is not an exit strategy. A credible exit involves a clear understanding of absorption rate for the local market, a realistic sale price evidenced by comparables, and a timeline that comfortably sits within the loan term. Refinance exits require evidence that the projected rental income and completed value will support the refinance quantum.

Poor contingency allowances and thin equity contributions round out the common failure points. A deal that only works if the build comes in on budget and the market holds steady is not a deal most lenders will fund for a first-time developer.

Joint Ventures and the Role of an Experienced Partner

A joint venture with an experienced developer is one of the more effective ways for a first-time borrower to access development finance without the limitations a solo first-application brings. Lenders view the experienced party's track record as directly relevant to the scheme, particularly where they hold a meaningful equity stake and are operationally involved in decision-making.

The distinction lenders draw is between a development partner who is genuinely co-invested and active, and a passive financial investor who contributes capital but brings no operational expertise. The former can support a credit application materially. The latter does not replace the underwriting concerns around borrower inexperience, it simply changes the equity picture.

From a legal and lender perspective, the joint venture structure matters. Whether the development is held in a special purpose vehicle (SPV) with both parties as shareholders, or under a joint ownership and development agreement, the lender will want to understand the arrangement clearly before formal terms are issued. Legal advice on the JV structure before approaching lenders is sensible, and most solicitors experienced in development finance can turn this around efficiently.

For developers considering a JV route to their first project, it is also worth considering how the arrangement might transition on subsequent schemes. Lenders will recognise the first completed project as a credit to both parties, which typically opens up better leverage and broader lender choice for the second scheme.

Speak to a development finance specialist today
Take the next step with your property project and find out whether development finance is right for you. We’ll work alongside you throughout, liaising with lenders, managing information requests, and keeping the process moving efficiently from initial enquiry through to completion.

Projects Best Suited to First-Time Developer Finance

Lender appetite at this stage of a borrower's journey concentrates around schemes where the risk profile is contained and the variables are limited.

Single-unit residential new-builds or small conversions are among the most fundable. A single-dwelling project, or a well-evidenced conversion of a commercial unit into two or three apartments under permitted development rights, gives lenders a contained construction risk, a single exit event, and a straightforward monitoring programme.

Projects involving a straightforward change of use under permitted development, such as converting offices or light commercial space into residential units, can be suitable for first-time developers where the scheme is clearly defined and does not rely on complex planning risk. Lenders will still focus on build complexity, contractor experience and exit viability, but where the works are contained and the end use is well understood, these projects can represent a manageable entry point into development.

Projects with clean, unconditional planning consent are strongly preferred. Schemes where planning is subject to pre-commencement conditions, legal agreements, or infrastructure contributions that have not yet been satisfied carry additional risk. A first-time developer presenting a consented, unencumbered site with a reliable cost plan is a meaningfully different proposition to one where planning conditions remain outstanding.

Small residential developments of two to six units on a single consented site are achievable. Beyond that number, most lenders will want to see some track record, and multi-phase or phased handover schemes tend to fall outside appetite for a first application.

Heavy refurbishment and conversion projects are also well-represented in this sector. The transition from a bridging loan for refurbishment to a full development facility for a more substantial conversion is one of the more natural stepping-stone routes into development finance for borrowers with prior bridging experience.

Commercial development and mixed-use schemes tend to be more demanding underwriting propositions for first-time borrowers, given the complexity of commercial lettings, tenant covenants, and pre-let requirements.

There are also deal types that specialist lenders will not comfortably consider at this stage regardless of other strengths. Phased developments where later phases are dependent on earlier sales receipts introduce cash flow sequencing risk that most lenders will not accept without a prior track record. Mixed-use schemes where commercial income forms a material part of the exit are assessed against commercial underwriting criteria that work against a first-time applicant. Planning-led uplift deals, where value depends on a consent not yet granted, are rarely fundable at this stage. These project types are better revisited once the first clean scheme is behind the borrower.

Why a Specialist Broker Makes a Difference for First-Time Developers

The difference between a first-time developer being funded at appropriate terms and being declined, or worse, accepting terms that do not suit the deal, often comes down to the quality of the lender introduction and how the application is presented.

Most specialist development lenders work exclusively through intermediaries. Direct approaches from borrowers without prior relationship are either not accepted or are processed less efficiently. Access to the lenders most likely to consider a specific first-time scheme requires knowledge of current underwriting appetite, which varies considerably across the market and changes with trading conditions.

Research from Shawbrook found that 60% of developers agreed that obtaining funds for development has become progressively more difficult, and 60% cited difficulty in finding the right financial expertise to guide their decisions. That finding reflects what we see in practice: borrowers who approach development lending without specialist guidance often spend significant time and application costs with lenders who were unlikely to approve the deal from the outset.

We advise on the initial appraisal before any lender is approached. This is not a formality. A first project where the numbers are presented correctly, the contractor is credibly framed, and the exit is fully evidenced reaches credit with a materially better chance of approval, and typically at better terms. Lenders price confidence into their facilities, and confidence comes from presentation as much as from underlying deal quality.

Our panel includes specialist development lenders, challenger banks active in first-time borrower schemes, and a number of private credit providers whose appetite for smaller developments with newer developers is stronger than the mainstream market. We match the facility type to the deal profile, and where joint venture finance is the right route, we work with the full structure rather than just the lead borrower.

For borrowers considering land purchase as a precursor to a development facility, development finance for land purchases or a combined land and development facility may also be worth exploring at this stage. Where a project does not yet meet full development finance criteria, bridging finance for heavy refurbishment provides a practical entry route, with a refinance into a development facility once planning and build readiness are established. For developers who have completed a project and need to manage a sales period beyond the original facility term, development exit finance is worth understanding before that position arises.

meeting with mortgage and property finance adviser to discuss new development

From Application to First Drawdown: The Process

Most of our clients are experienced investors or developers. The process below is designed to move quickly and avoid unnecessary friction, while being transparent about where the realistic pinch points are.
01

Initial assessment

A brief conversation about the project, the site, the planning position, the proposed contractor, and the borrower's equity and exit expectations. We form a view at this stage on lender suitability and deal viability before any formal process begins.
02

Appraisal review

We review the project appraisal, including purchase cost or existing land value, build costs, contingency, finance costs, professional fees, and projected GDV. Where appraisal assumptions need adjustment, we advise before the deal goes to market.
03

Lender selection and terms

We approach a shortlist of lenders whose current appetite aligns with the specific scheme profile. Most specialist lenders will issue indicative terms within 48 to 72 hours of a well-packaged submission.
04

Formal application and valuation

On acceptance of indicative terms, the formal application is submitted. The lender appoints a surveyor to value the site and assess the GDV, and in most cases a QS review of the build cost plan is conducted simultaneously.
05

Credit approval and legal

Following a satisfactory valuation and QS report, the application proceeds to credit. Solicitors are instructed on both sides to handle the legal work, including the facility agreement and security documentation.
06

Drawdown

The day-one advance is released on completion of legal formalities, covering the land or purchase cost and initial professional fees where applicable. Subsequent construction drawdowns follow monitoring surveyor sign-off at agreed build stages.

Timescales from initial discussion to first drawdown will vary from project to project, but most schemes will typically take from six to twelve weeks. Small or straightforward conversions with a clean title, clear planning and no complications can be completed within 4-6 weeks. A complex multi-unit new-build with conditions to discharge will sit toward the longer end.

First-time developers most commonly lose time at two points: arriving without a confirmed contractor (which stalls QS review and lender appetite simultaneously) and a scheme with pre-commencement planning conditions that have not yet been formally discharged. Both issues are easily resolved before the finance process begins, and neither requires a lender to be involved before they can be resolved.

Completing Your First Project: What Changes on the Next One

The first completed development is a meaningful marker in a lending relationship. Beyond the financial return of the project itself, it creates a verified track record that opens doors in the specialist development finance market that are not accessible to a first-time applicant.

After completion, the borrower has a concrete case study: the scheme type, the build cost, the GDV achieved, the exit route taken, and the timeline. This information sits at the centre of every subsequent development finance application, and lenders respond to it differently than they respond to projections and intentions.

Development finance for a repeat or small developer operates on better leverage, wider lender choice, and reduced monitoring requirements compared to a first project. The small developer finance market also includes lenders who specialise in borrowers with one or two completed schemes, providing a natural next step from the entry-level facilities that support first projects.

The same principle applies internally: a developer who completes a straightforward residential conversion as a first project and then looks to move into a more complex development, such as a residential to commercial conversion or a commercial development scheme, has demonstrably stronger credentials for that second step than they would approaching it as a first project.

Find Answers

Land Purchase Development Finance FAQs

Yes, subject to the right deal structure. Lenders working in this part of the market accept that borrowers start somewhere. The absence of a completed scheme does not make a project unfundable, however it does shift the lenders underwriting emphasis to focus onto the professional team, contractor credentials, scheme complexity, and the developers equity contribution. If a project is proposed with a credible contractor and backed by a realistic appraisal, lenders may even consider this a lower risk than a complex scheme with a poor exit strategy by an experienced developer, despite the developers track record.

Equity requirements for first-time developers can be higher than for repeat developers due to the additional risk lenders are accepting in these cases. Most lenders will want to see the borrower to contribute 30% to 40%+ of total project costs, however this will vary between developments depending on the GDV, the strength of the professional team, and the lender's appetite at the time. Higher equity contributions by the developer reduces lender exposure and therefore improves the likelihood of credit approval. Additional security cross-charged from a separately owned property can supplement cash equity in some cases.

Usually lenders would prefer to see smaller, simpler schemes from first-time developers, even if the individuals have prior experience in the property or construction industry. These will typically be single dwellings, small residential conversions, or straightforward new-builds of two to six units on a single consented site. All projects would be expected to have sensible exit values, backed by a valuation. Projects with unconditional planning consent, a named and experienced contractor, and a single or well-evidenced exit are also more likely to attract terms from a lender compared to  phased or mixed-use developments.

Lenders appoint an independent surveyor who produces a Red Book valuation of the completed development based on local market evidence. Where a borrower's projected GDV is not well-supported by recent comparable sales, the valuation will reflect that. The lender's LTC and LTGDV parameters are then applied to the surveyor's figure, not the borrower's projection. Working from realistic GDV assumptions from the outset avoids leverage shortfalls emerging at valuation stage.

Meaningfully so, where the joint venture (JV) partner has directly relevant development experience and holds an equity stake in the scheme. Lenders treat the joint venture as a whole, and an experienced co-developer's track record carries weight in the underwriting. The structure of the JV needs to be clearly documented, and both JV partners would typically be required to provide personal guarantees.

Completion of a first project materially changes the borrower's position for subsequent applications. Lenders who declined or applied conservative terms on a first scheme will revisit their position once a completed development and a successful exit can be demonstrated. Leverage typically improves, lender choice widens, and some elements of the additional monitoring requirements applicable to first-time borrowers are relaxed. Many developers find the second project is funded on notably better terms than the first.

Yes, in many cases. A combined land and development facility allows the full project cost to be funded under a single facility, with the land advance drawn at day one and the construction tranches released in stages managed by a monitoring surveyor. Some lenders require land to be purchased using bridging finance, with the development facility introduced once construction begins. The most appropriate approach depends on planning status, build timeline, and lender preference. Our development finance for land purchases page covers this in more detail.

Generally yes. Lenders price for perceived risk, and a first-time application carries more uncertainty than a repeat developer with a track record. Interest rates on first-time developer finance typically sit toward the upper end of each lender's pricing range, and arrangement fees may also be marginally higher. As the borrower builds a track record, pricing improves accordingly. The difference between a first and second project, in terms of rate and leverage, is often significant.

Developers reviewing architectural plans for a residential land development project
Development Finance

Next Steps: First-Time Property Developer Funding

We support clients through the full development journey, from funding the first project to structuring more complex transactions as experience and appetite grow. The goal at the first project stage is to complete cleanly, at or within budget, with a documented exit. Everything that follows builds from that.

If you are working on your first development project, speak to our team to find out how we can support you. We are happy to give you a view on fundability and likely terms without any obligation so that you know what is available, what it will cost, and what structure makes most sense for your deal.

We have further information on our website about how we approach development finance, as well as a useful development finance glossary which some first-time developers find helpful. Our development appraisal and finance calculator is also incredibly helpful to first-time developers embarking on their first project. 

Ready to get started?
Speak to us today for a no-obligation consultation about residential mortgages, development finance, bridging loans, buy-to-let mortgages, or commercial property finance.
Bridging Finance
Property details
Finance details
Development Finance
Project details
Finance details